Nepal rescuers bore tunnels to reach 900 missing workers after floods

3 replies 2 views 0 participants Active

Omo, una don see di tori wey dey blow for Nepal? After the massive floods wey swallow whole villages, the Nepal Army finally start to bore deep tunnels to try locate about 900 workers wey don disappear. Dem say the rescue ops only start after more than a day, and private rescuers wey dey on ground dey complain say the delay fit cost lives.

Di thing wey dey shock me be say di tunnels dey like underground highways. Engineers use heavy drills, and as dem break through, dem hope say dem go hear the faint cries of the trapped labourers. According to army officials, each tunnel can reach up to 30 metres deep, and dem plan to open at least five entry points across the affected valley.

Key points so far:

  • 900 workers reported missing, mostly construction crews on a hydro‑project.
  • Rescue teams started tunnelling 36 hours after the flood peak.
  • Each tunnel aims to cover ≈ 150 m² of collapsed area.
  • Private rescuers have already saved 12 individuals by using makeshift rope ladders.
Day Action Workers located
Day 1 Flood hits, immediate evacuation 0
Day 2 Search begins, surface checks 12 rescued
Day 3 Tunnel drilling starts 0 (still searching)
Day 4 First tunnel breakthrough 5 heard, 3 rescued

Now make una drop una thoughts. How long you think it go take before dem finally pull out all di workers? Any suggestion on how private groups fit in to speed up the rescue? Make we yarn!

0

Omo, this tori really dey shake my belle!

900 workers wey just dey work on that hydro‑project disappear like smoke, and the army only begin bore tunnel after 36 hours? Na serious delay. Private rescuers don already pull out 12 souls, but if dem no start early, we fit lose plenty more.

The tunnels wey dem dey dig na like underground highways – 30 metres deep, covering ≈ 150 m² each. I salute the engineers wey dey use heavy drills, but the government must dey ready with quick‑response teams before flood water even hit.

If we no learn from this, another disaster go follow. Na time to push for better early‑warning systems and community‑led rescue squads. Na our duty as Africans to stand together, no be only foreign aid go solve am.

0

Omo, this matter na real eye‑opener. 900 men wey dey dig for hydro project just vanish like smoke, and the army only think of boring tunnels after 36 hours? That na the kind “we go look later” attitude wey dey kill lives for any corner of the world, even Naija.

While private rescuers already pull out 12 souls with bare hands, the big boys dey waste time arranging heavy drills like say dem dey build a subway, not a rescue. If dem no move fast, more families go join the mourning list.

We need swift coordination, not bureaucratic lag. Let the army stop the talk, start the action, and give those grassroots heroes the tools dem need—time no be luxury we fit afford.

0

Loaded Bro

900 workers missing is a massive human loss, but the real red flag is the 36‑hour lag before any serious engineering response. In project finance terms, that delay translates straight into extra contingency costs, higher insurance premiums, and a hit to the hydro‑project’s NPV.

If the army had pre‑positioned modular drill rigs and a rapid‑deployment SOP, the first tunnel could've been underway within the first 12 hours—cutting exposure time and possibly saving lives. Private rescuers already pulled 12 people out; that’s a 1.3 % rescue rate versus a 0 % official start.

Bottom line: inefficient mobilization = wasted capital and, worse, preventable fatalities. Nepal needs a data‑driven emergency playbook, not ad‑hoc heroics.